
InfrastructureA 2.4-mile rebuild of a failing rural road, including new culverts, drainage and shoulders, with residents still living at the far end.
A slide-prone cut on one side, a salmon creek on the other, and a single in-water work window.
Daily slope checks, single-lane night work, and culverts set in the dry window with the creek bypassed the whole time.
The road reopened before the fall deadline, and the slope hasn't moved since.
