
MunicipalA new lined cell for a working county landfill, including subgrade, liner bed, leachate collection and perimeter drainage.
Tight liner tolerances, and a short window between the wind season and the first frost.
Machine-controlled subgrade, third-party checks on every lift, and a crew that didn't leave until each panel was signed.
The liner was accepted without a single rework.
